Wind-Solar-Diesel-Storage Micro Grid System
Wind-Solar-Diesel-Storage Micro Grid System
Wind-Solar-Diesel-Storage Micro Grid System

 Micro Grid Demonstration   Project  in  Cuoqin  County was set up in2012, was constructed by JIKE. Phase 1 project was constructed in June, 2013,and completed and put into productionin November, 2014. Phase 2 project was constructed in July, 2015, and completed and put into production in October,2015. Four PV power stations in Cuoqin county were repaired in 2015.

Entrusted by Cuoqin countygovernment in June, 2016, JIKE completed the engineering design, equipment installationand operation etc. for four PV power renovation and extension projects, andremoved and rebuilt the old PV power station modules in Cuoqin county

Beforethe construction of the project, the power was mainly supplied by off-grid PVpower station and diesel generator with the high generating cost and instablepower supply, which caused great inconvenience to local residents andrestricted the local economic development seriously. The droop control mode wasfirst adopted in Smart Grid Demonstration Project in China, which solved the connectingto the grid of the PV power station and small hydropower station and realizedthe independent and grid connected operation modes, increasing the gridreliability and solving the power utilization of local region.